Potential valve damage was noted during internal testing of the first skid
01
Pre-test Set-up
Field set-up
02
Pressurisation
API6D vs field
03
Hold as per B31.3
B31.3 standard
Root cause: API6D lab-controlled test set-up differs from field conditions. Sequence revised from Skid 2.